This was a last minute trail odd job session.
Jez and myself (Tom) raked the newly opened section on the north side. We then fixed the top log step on Piper’s hill. A loose step on Pete’s steps was also put back into place.
We did a bit of a survey ready for our next trail build days (Dec 15th & 16th). We plan on fixing all of the pot holes on the trail on that weekend.
We raked a load of leaves off the trail and reset a rock jump on a section that we call motorway 1.