This was a low-key build evening. With summer almost over then light levels drop rapidly around 8pm – giving us just over an hour to do things.
The target for the night was to move the three large logs around in the triangle. Two of them are being used for a feature on the way in to the optional North shore loop. The third log will be used on an elevated section of wood.
After moving the logs we put the top on the out bridge.
Things are now ready for our major build weekend on the 17th and 18th of September. We’re holding a BBQ on site and camping overnight on the Saturday.