- A quick review of what we got up to last year:
- 15th Oct 2010: 60 tonnes delivered
- Dec 2010 trail build plans.
- 28th Dec 2010: new line before triangle.
- Sat 8th Jan 2011: motorway 2 berms and surfacing.
- Sun 9th Jan: largest turnout (16 people!) motorway 2 surfacing.
- Sat 22nd / Sun 23rd Jan: Surfacing the alley.
- Sat 5th / Sun 6th Feb: Surfacing near woodwork.
- Sat 19th / Sun 20th Feb: Finished surfacing near woodwork.
- Sat 12th March: moving rubble and chippings to new line before triangle.
- Fri 18th / Sat 19th / Sun 20th March: surfaced new line, resurfaced top section of Piper’s hill.
- Sat 26th March: resurfaced two boggy sections near the pond.
- Wed 16th April: Started the new route on Piper’s hill.
- Sat 9th / Sun 10th April: New route on Piper’s hill.
- Wed 13th April: Moved material onto Piper’s hill.
- Sat 16th April: Shifted material to area near pond.
- Sat 14th May: Entrance to triangle area.
- Sun 15th May: Continued with entrance.
- Sat 18th June: Triangle bridge beams, surfaced top of Piper’s hill.
- Sun 19th June: Started digging the triangle route. Built jump on Piper’s hill.
- Sat 16th July: Triangle digging and bridges.
- Tue 19th July: Triangle digging.
- Tue 2nd August: Triangle digging.
- Wed 10th Aug: Triangle woodwork plus more digging.
- Wed 17th Aug: Triangle digging.
- Wed 24th Aug: Triangle digging – channel tunnel moment.
- Thurs 25th Aug: 50 tonnes of chippings delivered.
- Sat 3rd Sept: Triangle log moving plus route tweeking.
- Wed 8th Sept: Triangle log moving and bridge topping.
- Sat 10th Sept: Triangle log moving.
- Sat 17th Sept: Dust moving plus start on triangle surfacing.
- Sun 18th Sept: Triangle surfacing.
- Thur 13th Oct: Another 20 tonnes of chippings to the triangle.
- Sat 22nd Oct: Triangle surfacing.
- Sun 23rd Oct: Triangle surfacing.
- Thur 10th Oct: Another 30 tonnes to the triangle.
- Sun 13th Nov: Installing signs and shifting chippings.
- Sat 26th Nov: fixing Piper’s hill.
- Sun 27th Nov: first half of the East side of the pitch.
- Sat 10th Dec: second half of the East side of the pitch.
- Sun 11th Dec: rebuilding the South side of the pitch.
Above December 2010 |
Below December 2011 |
Also see the overall build diary.