After a long gap over the summer we will be back working on the trail. It’s in great shape now.
We’ll mainly be fixing up a patches of trail ready for the winter. We’ll have a load of material on site and the power barrow.
We’ll probably do some leaf sweeping too.
As with all of our build days you are free to turn up or leave whenever you want. We’ll be meeting at 10am in the car park. After that walk round until you find us.
See the build diary for previous trail build activity.