Trail build report: tidy up, new line and triangle exit
This was a low key trail tidy session. We started out by blocking a potential short cut on Piper’s hill with branches. The step jump then received a tune up. After that we removed some neck level wire from an old fence that was a bit close to the trail down near the triangle. We […]
Trail build report: tidy up, new line and triangle exit Read More ยป