Trail build report: 13th Sept 2009
We tidied up the trail on the South side of the pitch. This was originally build in December 2008. The line was straightened out a bit and a new berm was built in place of a tight corner round a tree. Meanwhile, on the North side of the pitch another pointless corner was removed. Finally […]
Trail build report: 13th Sept 2009 Read More »