Events

April build day #4.

We’ve been working on the new Red section for a few weeks now. It’s starting to come together: The berms are taking shape. We’ve moved a fair bit of the woodwork into position. The bridges are coming on too. Our aims this weekend are to finish the woodwork, to bench cut the entrance and exit, […]

April build day #4. Read More »

April build day #2.

The new start loop will be complete by the end of March. This means that we can turn our attention to the far more interesting new Red section in April. There’s loads of things planned for this area: big bermed switchbacks down the hill boardwalk sections moved from the old route rock features big bridge

April build day #2. Read More »

April build day #1.

The new start loop will be complete by the end of March. This means that we can turn our attention to the far more interesting new Red section in April. There’s loads of things planned for this area: big bermed switchbacks down the hill boardwalk sections moved from the old route rock features big bridge

April build day #1. Read More »

April build day #0.

The new start loop is now finished so we have turned our attention to the far more interesting new Red section. There’s loads of things planned for this area: big bermed switchbacks down the hill boardwalk sections moved from the old route rock features big bridge over the ditch We’ll meet at around 11am in

April build day #0. Read More »