Croft Diary

Trail build report…alley surfacing and some fence work

This was a short build session. The entrance to the alley section was resurfaced after being hammered by the recent Prospect Hospice ride. Jon Proudman was cycling past and stopped to help. The alley was surfaced in Oct 2010, exit mods on 5th Dec 2010 surfaced Jan 2011 and the final link in Dec 2011.  A fence was built on Piper’s hill next

Trail build report…alley surfacing and some fence work Read More »

Trail build report: Sat 3rd March – gravel shifting and resurfacing

These special artistic effects were produced by using a very low spec camera on a phone (Nokia C1-01). It was finally looking like spring on Saturday morning at 9am when Brandon Hire delivered the compactor (whacker). Jez brought the tools round and I kept myself entertained fixing the puncture on one of the wheel barrows

Trail build report: Sat 3rd March – gravel shifting and resurfacing Read More »