If you want to ride then go on the trip to Rhayader.
We’ve built a lot of new trail this year. We need to surface some existing sections to ensure that they survive the winter.
The aim will be to reinforce several bits of Piper’s hill (1 on the map) with rubble before the probation service move a load of chippings in for us to surface the section with.
As well as Piper’s hill we’re going to finish off some sections on the South side of the pitch (2 and 4).
We’ll have the probation service, so we won’t be wasting time pushing wheel barrows around.
We’ll be meeting in the car park at 10am. If you arrive after that then take a walk round the trail. We’ll be around somewhere. Otherwise you can call us on 07010036444.
Useful tools include spade, mattock, pick axe, saw, wheebarrow. We’ve got quite a lot of tools between us so don’t worry if you can’t bring any.